Ceiling
Chandeliers
Mini-Chandelier
Flush Mounts
Semi-Flush Mounts
Pendants
Mini-Pendants
Directional Lighting
Recessed Lighting
LED Chandeliers
Wall
Bathroom Fixtures
Wall Sconces
Picture Display Lights
LED Wall Lights
Table
Floor
Outdoor
Exterior Flush Mounts
Hanging Lights
Post Lights
Exterior Fans
Wall Lanterns
LED Outdoor
Fans
Indoor Ceiling Fans
Outdoor Ceiling Fans
Fan Wall Controls
LED Fans
Our Designers
Sign In or Create an Account
Wishlist
Ceiling
Chandeliers
Mini-Chandelier
Flush Mounts
Semi-Flush Mounts
Pendants
Mini-Pendants
Directional Lighting
Recessed Lighting
LED Chandeliers
Wall
Bathroom Fixtures
Wall Sconces
Picture Display Lights
LED Wall Lights
Table
Floor
Outdoor
Exterior Flush Mounts
Hanging Lights
Post Lights
Exterior Fans
Wall Lanterns
LED Outdoor
Fans
Indoor Ceiling Fans
Outdoor Ceiling Fans
Fan Wall Controls
LED Fans
Our Designers
No Image
Available
Image may not reflect selected features
Pre-Bent S Curve MonoRail (700MOBHSC60BRZ)
BROWN MO HORIZ. S-CURVE ANT.B
Product Specification
Item #
700MOBHSC60BRZ
Dimensions
Height: 0.60"
Width: 0.30"
Additional product details
Category
Track Ltg.
Subcategory
Track Accessories
Finish
Bronze
Style
Contemporary
Option
Title 20
Category
Monorail Hardware
Finish
Antique Bronze
Style
Contemporary | Modern
Option
Dry Rated
Bulb Dimmable
False
Introduction Date
01/01/2005
Ship Carton Height
6.00
Ship Weight
3
Special Features
From the brand formerly known as Tech Lighting
Vendor Ship Method
UPS Fedex
Warranty
1 Year
Weight
1.10
24 Volt
False
Adjustable Head
False
Cable Field Cuttable
True
Cannot Ship To California
False
Cannot Ship To Canada
False
Damp Rated
False
Dark Sky
False
Dry Rated
False
FWC Compliant
False
Integrated LED
False
Item Color 1
Brown
Master Color
Brown
Motion Sensor Included
False
Photocell Included
False
Replaceable Lamp
False
Reversible
False
Safety Rating
ETL
Shape
Pre-bent S-curve
Sloped Ceiling Compatible
False
Solar Powered
False
SORAA
False
Stocking Type
Made to Order
System
MonoRail
Title 20
False
Title 24
False
Transformer Required
False
Warm Color Dimming
FALSE
WET IP65
False
Wet Rated
False
Finish
Additional options that would change other selections
Item Color 1
Additional options that would change other selections
Master Color
Additional options that would change other selections
Call for Price
Qty:
pkgs
pcs
BASE PRICE:
$
325
00
/
/ 1
($325.00 / 1)
Save
%
List Price:
$
Add To Cart
Add To Cart
Add To Estimate
Add To Wishlist
Save To Compare
Availability:
Manufacturer availability unknown.
To:
From:
Subject:
Hello, take a look at this great item that I found at JELLIOTT LIGHTS.
Send Email